Great Northern - Superior Terminal

Railroad Tracks Navigation BarLink to MINN-RAIL Schedule PageLink to MINN-RAIL Layouts PageLink to MINN-RAIL Hotel PageLink to MINN-RAIL Restaurants PageLink to MINN-RAIL Hobby Shops PageLink to MINN-RAIL Links PageLink to MINN-RAIL Registration PageLink to MINN-RAIL FAQ PageLink to MINN-RAIL Contacts PageLink to MINN-RAIL Home PageLink to MINN-RAIL Information Page

GN LogoWelcome to the Great Northern Railway Superior Terminal. This HO scale prototypically based layout features five specific prototype scenes in Superior Wisconsin circa 1955. The layout focus – both modeled scenes and operations - is on handling – switching - freight traffic. Track arrangements follow the prototype as of the mid-fifties with limited modification and room compensation.

Layout operations represented are exclusively yard classification switching within yard sub sections and supporting various facilities (ice houses, freight house, team tracks, car cleaning, interchange, weigh track) and terminal transfer activity. There are no mainline trains in the operational scheme and the focus is on representing real-time prototype work actions and pace. Car routing is prototypically based “route cards” for all car classification and forwarding.

Layout construction started late 2021. The layout is fully operational. There is no scenery in-place currently.

Superintendent Scott Thompson
Division or Location: Superior Terminal, 2nd Subdivision, Missabe Division
Interchange Railroads: LSTT, NP
Size of Railroad: 11 x 44, approximately 400 sq. feet
Scale: HO
Era: 1955
Control System: Digitrax
Scale Clock Speed: None - real time
Length of Session: 2.5 Hours
Number of Crew: 5
Train Control: Yard Limits
Are Radios Required: No
Listed Jobs: 28th St Yard (2 person crew - Engineer, Conductor), 17th St Yard (2 person crew - Engineer, Conductor), Terminal Transfer (1 person crew)
Accessibility: Layout located in a walk-out basement w/ door along with a stairway to upper floor
Distance from hotel: 24 miles
Estimated travel time from hotel: 40 minutes
Web Site: {None...yet}
Pets: 2 cats

Layout photos (click to enlarge):

Return to Layouts Page

Information

Cute Railroad Page Divider

Note: The Click on the following link and leave the MINN-RAIL site means that the link following will take you off the MINN-RAIL website. We have no control over the content of these sites, but believe they will be of interest.   
Send email to the webmaster with questions or comments about this web site.

Site originally designed by PJWebWorx.
Copyright © 2002, 2003, 2004, 2007 by MINN-RAIL.